b'the team has relied on just-in-time material delivery: Were stealing every single square foot of storage that we can use and trying our best to bring in our vehicles and delivery trucks without disturbing the local traffic, says Ploegman.Its tough to build where there is no site beyond the footprint of our building, he adds.Tricky though the development may be, Concord and its team have not lost their stride. As of mid-October, the development team had completed nearly 80 per cent of the project and was on track to open its new base of operations in spring 2025.Were all very excited to bring this dynamic, mixed-use building to life in the Exchange District, says Alston. We think its a dynamic addition that will add a lot of value tothe area. Design renderings courtesy of AtLRG Architecture.Your Community Design PartnerMISC. METAL FABRICATIONSTRUCTURAL STEEL YEARACHIEVEME0 N2 T2002-20221520 Charles Ave., Brandon, MBTF:(800) 573-5048 glendale.atomjet.com vernereimer.com 46 BUILD MANITOBAwinnipegconstruction.ca'