21 Issue 3 | Fall Edition | 2026 BUILD MANITOBA BENCHMARKS of insurance to be maintained by the design-builder and clarifications on the period of time during which the design-builder must maintain insurance coverage for the project. These updates reflect the evolving expectations of the construction industry regarding appropriate insurance coverage. Finally, the CCDC 14 – 2026 includes clarifications on the owner’s right to have work done by its own consultants and other contractors. This provides greater clarity on the scope of the owner’s reserved rights during the course of the design-build project. CONCLUSION The release of CCDC 14 – 2026 and CCDC 32 – 2026 represents a meaningful evolution in standard form construction contracts in Canada. The CCDC 32 in particular introduces an innovative progressive design-build framework that, through its project gates structure, offers a more controlled approach to project development. Meanwhile, the updates to CCDC 14 bring that familiar form into alignment with current legislative requirements and industry practices. Readers should familiarize themselves with these new documents and consider how they may be applied to upcoming projects. Note: This article is of a general nature only and is not exhaustive of all possible legal rights or remedies. In addition, laws may change over time and should be interpreted only in the context of particular circumstances such that these materials are not intended to be relied upon or taken as legal advice or opinion. Readers should consult a legal professional for specific advice in any particular situation. The release of CCDC 14 – 2026 and CCDC 32 – 2026 represents a meaningful evolution in standard form construction contracts in Canada.
View this content as a flipbook by clicking here.