b'PERFORMANCE DRIVEN.Its not just a slogan. Its corporate culture we believe in.What is Four Point Electric?Four Point Electric Inc. offers electrical contracting services on a large variety of commercial, industrial, institutional, and utility projects throughout the Yukon, British Columbia, and Alberta. They are COR Certified Recognized by British Columbia Construction Safety Association (BCCSA) and Northern Safety Network Yukon (NSNY).What is COR? COR, or Certificate of Recognition, is a voluntary incentive program that recognizes companies who develop and implement health and safety systems that meet an industry standard. www.fourpointelectric.caProject Highlight: Sunpeaks ReservoirSun Peaks Resort Surface Water Supply System ProjectGeneral Contractor: PCL Constructors Westcoast Inc.Engineer: ICI Electrical Engineering Ltd.This project was put into development with PCL Construction in order to increase the amount of potable water available to the Sunpeaks Resort community, due to the current ground water supply being unable to keepup with the current demand in the winter season. SunPeaks Resort is located northeast of Kamloops, BC. The reservoir is located just northwest of the top of the Sundance Chair Lift.The project consists of a Monitoring Bay that Armitage Creek runs directly through, which is connected to a Diversion Control Building through water pipes that connect the two structures. From the Diversion Control Building, the water from Armitage Creek is then diverted to two reservoirs, one for domestic use and one for snowmaking.FPEI custom designed and structurally certified The Diversion Control Building is responsible for controlling and monitoringa strong back cable reel specifically for this site. the amount of available water for domestic use and snow making. Writing a safe work procedure to handle the 4000lb cable reel. This enabled the civil portion Four Point Electric Inc. took on the role of electrical contractor for theof the cut and cover scope to safely be reduced project, which provided installation of distribution, instrumentation,from two weeks to just three days! There was a communication, general lighting and heating for the new building.bet on site FPEI would not achieve power to the Diversion Control Building prior to the winter Over 750 linear metres of fiber optic and power cabling were installedseason snowing in the site. power and heat was between the Reservoir Pumphouse and the Diversion Control Building for turned on October 23, 2020, protecting valuable the purpose of monitoring and controlling reservoir levels. equipment throughout the winter.MONITORING BAY STRONG BACK CABLE REEL DIVERSION CONTROL BUILDING'