b'challenges, as the overall layout and grid of the building is very rigid and traditional, explains Legris. Weve broken down the long corridors [and] Design renderings courtesy of Number TEN Architectural Group. brought in daylight, biophilic elements, colour, texture and lots of whimsy to make the space more relaxedand comfortable.Our goal is to provide Toba with a space that not only functions from an everyday service delivery standpoint, but also inspires them to keep going, she adds. TRANSFORMING THE SPACEWork on the Toba Centre began in the fall of 2022 after asbestos abatement was completed several months prior. Highlights of the work to date include adding interior stairs to create greater connectivity between floors, enhancing the insulation and updating the brickwork aesthetic with features like an exterior aluminum panel wall. Notably, says Bockstael, the renovation includes the installation of a hydronic CUSTOM DESIGN. mechanical system designed to not only enhance indoor air quality, but also HIGH SPEED provide compartmentalized heating and cooling to areas where privacy and INSTALLATION. discretion are top priorities.Child service providers need to maintain a lot of confidentiality between each of the buildings rooms and suites, so there are devoted HVAC systems for each of those spaces with individual controls and independent ductwork that keeps noise from travelling, Bockstael explains. MUROX Legris adds the team has done extensive upgrades to the building THE PREFABRICATED BUILDING ENVELOPE SYSTEM THAT SETSenvelope and has worked with its YOUR IMAGINATION FREE consultants to ensure the heating and cooling systems are energy efficient Our prefabricated building system includes the building envelope, the steelwith the flexibility to keep occupants framing, as well as the load-bearing panels. Components are deliveredcomfortable in our harsh andconstruction-ready to your jobsite. Murox reduces commercial, industrial, variable climate.and institutional build times by up to 50%. Experience Murox.Youll never look back. Making the new Toba Centre more accessible is another priority for the team. It is being designed to the MUROX.com highest standards for wheelchair and 1-866-GO MUROX handicap accessibility, which includes 4 6 6 - 8 7 6 9 the installation of a substantial ramp in its front entrance. 50 BUILD MANITOBAwinnipegconstruction.ca'